www.epa.gov/iaq/moisture
Pervious pavement areas are to be inspected weekly and after every storm that exceeds 0.5 inches of rainfall.
Whenever possible, pervious pavement areas are to be inspected before a major storm. Inspection consists
of looking for debris, sediment build-up, proper drainage after a storm, surface deterioration or spalling and
observable vegetation growth.
Pervious pavement maintenance consists of removing debris and sediment and maintaining the vegetation.
Building:___________________________________________________________________________________________
Address:___________________________________________________________________________________________
Pavement ID/Location:_______________________________________________________________________________
Inspected by:__________________________________________________ Date:_________________________________
ID – Number to be used to identify problem on site sketch
G – Good, no action needed
F – Fair, monitor condition periodically, plan necessary repairs
P – Poor, immediate action needed
N/A – Not applicable
ID G
F
P
N/A REMARKS
Area requires
cleaning
Improper draining
1
Sediment build-up
3
Upland area
requires mowing or
reseeding
Surface
deterioration or
spalling
4
2
5
F-10