www.epa.gov/iaq/moisture
Chapter 4:Operating and Maintaining Moisture-Controlled
Environments
Each section is concerned with regular inspection; the
cleaning, lubrication, repair or replacement that may
result from the inspection; and the documenting of
inspections and responses. Several of these sections
require the development of specific operation and
maintenance plans. The section-specific plans can be
assembled into a master moisture-control plan.
INTRODUCTION
The people who keep buildings working—the HVAC
mechanics, carpenters, plumbers, electricians,
engineers, custodians and managers—inherit the
good points and the bad points of the design and
construction.
This chapter consists of the following sections:
• Site Drainage Maintenance.
• Foundation Maintenance.
• Wall Maintenance.
• Roof and Ceiling Assembly Maintenance.
• Plumbing System Operation and Maintenance.
• HVAC System Operation and Maintenance.
87