IAQ.net Resources

EPA Moisture Control Guide 2013

Issue link: https://hi.iaq.net/i/248503

Contents of this Issue

Navigation

Page 136 of 144

www.epa.gov/iaq/moisture Areas paved with porous modular pavers are to be inspected weekly and after every storm that exceeds 0.5 inches of rainfall. Whenever possible, areas are to be inspected before a major storm. Inspection consists of looking for debris, sediment build-up, proper drainage after a storm, surface deterioration or spalling and observable vegetation growth. Pervious pavement maintenance consists of removing debris and sediment and maintaining the vegetation. Building:___________________________________________________________________________________________ Address:___________________________________________________________________________________________ Pavement ID/Location:_______________________________________________________________________________ Inspected by:__________________________________________________ Date:_________________________________ ID – Number to be used to identify problem on site sketch G – Good, no action needed F – Fair, monitor condition periodically, plan necessary repairs P – Poor, immediate action needed N/A – Not applicable ID G F P N/A REMARKS Area requires cleaning Improper draining 1 Sediment build-up 3 Adjacent area requires mowing or reseeding Surface deterioration or spalling 4 2 5 F-12

Articles in this issue

Links on this page

Archives of this issue

view archives of IAQ.net Resources - EPA Moisture Control Guide 2013